Projects in Iraq
Installation and Fabrication Projects in Iraq:
- Project: Fabrication, installation and welding of the pipeline, piping system, pumps & vessel installation works across all stations in west Qurna implementations and maintenance operations
Total: 500,000 Inch Diameter (ID)
- Project: Fabrication, installation and welding of the pipeline from the wells to the manifolds and to the CPFs and install 5 manifolds. Also the fabrication, installations and welding the Halfaya water treatment station SWP1
Total: 400,000 Inch Diameter (ID)
Client: Petro China company - Project: Basra Al FAW pipe line project, Execute pipe lines 46” with total length of 13 km
Client: Basra Oil Company
Date: 2013 - Project: West Qurna1 project, Installation of 42 chemical injection skids on the flow lines
Client: ExxonMobil – Baker Hughes
Date: 2022 – 2023 - Project: Zubair Field project, Installation of 111 chemical injection skids on the flow lines
Client: Samsung – Schlumberger
Date: 2017 - Project: Halfaya fields project, as a Sup contractor. Fabrication, installation and welding to connecting truck lines 24”, 22” & 12” in to the CPF with total length of 22 km, and connecting flow lines 6” & 8“ from the wells to the manifolds and connecting the piping system for the Source Water Plant
Client: Petro China company - Project: Hammar degassing station project, Installation the lingerie and receiver for the pipeline with 24” with total of 13,000 inch diameter (ID) and maintenance work for different piping sizes
Client: Shell – BGC - Project: Basra Refinery Unit for Third Gasoline Improvement project, welding (SMAW, GTAW) for carbon steel, stainless steel, and alloy steel for all diameters ranging from 1" to 20" on all exchangers, furnaces, hydrogen compressors, pumps for all applications, towers, material reception tanks, and exports
Total: 200,000 Inch Diameter (ID)
Client: Lens – Czech company - Project: Fabrication, installation and welding of the piping system of chemical blending plant
Client: HILAL AL-BASRA Co. - Project: Fabrication, installation and welding of gas compressors in Zubair1 for the gas compression to Um Qasr port for export with total of 12,000 inch diameter (ID)
Client: Shell – BGC
Date: 2015 - Project: Zubair field project, Installation of 35 chemical injection skids on the flow lines
Client: ENI – Baker Hughes
Date: 2014 - Project: Water treatment project, Installation of chemical injection skids on the flow lines
Client: Petrofac - Nalco
Date: 2014 - Project: Hammar Mushrif expansion project, fabrication, installation and welding of piping system
Client: ENI – STX
Date: 2018 - Project: New Basra Refinery project, fabrication, installation and welding of the12" line (SMAW)+ (GTAW), from the gasoline refining unit passing through the gasoline improvement unit to the combustion burner with a length of 8 km
Client: Basra Oil Company